Gathering Data During an eValid Monitoring Playback

Applying eValid to Rich Internet Application (RIA) Performance Monitoring.

Gathering Data During an eValid Monitoring Playback

Postby UserD » Wed Oct 08, 2008 12:26 pm

Is there a way to extract timing data during a monitoring test playback?
UserD
 
Posts: 18
Joined: Fri Oct 03, 2008 11:25 am

Re: Gathering Data During an eValid Monitoring Playback

Postby monitoring » Wed Oct 08, 2008 12:30 pm

Actually, the SaveRecord command reports time relative to the current script
instance...not the total sequence.

So, yes, if you CallScript 1 the SaveRecord times do not reflect total
times...but the ElapsedTime values do.

Here are the detailed instructions for the SaveRecord command:

http://www.e-Valid.com/Products/Documen ... ecord.html
eValid Tech Support Team
monitoring
 
Posts: 97
Joined: Tue Jan 01, 2008 12:48 pm


Return to Rich Internet Application Monitoring (RIA)

Design Downloaded from free phpBB templates | free website templates | Free Web Buttons