My Eval key ran out today. As I said before, I enjoyed the product.
I did not use all the features, For example, I never
used the programming extension, I simply edited the generated scripts (e.g. to change wait times).
This tool is record-playback oriented. It would be hard
(perhaps even not possible)to write scripts from scratch,
which seems to be a trend with some automation specialists these days. Note that I don't consider myself one of them, so for me a good record-playback engine is a bonus.
Perhaps it was a limitation of the Eval key, but I was unable to generate loadtests with more than 1 user
using the GUI. I worked around this my editing the loadtest file, adding the -eValid commands manually.
I was caught by surprise, as I thought the Eval key
would be valid one more day. If it was possible to extend it by just one day, that would be great, otherwise it's not a big deal.
I got pricing information from the web site. I don't have specific questions about it. Feel free to send me
additional info about it.